The subject of the work was to process documentation for the territorial decision (DÚR), documentation for the building permit (DSP), documentation for the construction assignment (DZS) and realisation documentation for construction (RDS) for reconstruction of the road II/103 – the through road in České Velenice, with the total length of 2.1km. This included reconstruction of the entire street area, including intersections, adjacent areas, sidewalks, sewerage, water main, public lighting and relocation of utility mains.