The project in the stages from documentation for the territorial decision (DÚR) to realisation documentation for construction (RDS) addressed the complex of five engineering structures on a four-lane local road. This included four bridges with the span of 15-20m and a bearing wall with the length of 170m. Due to the nature of overstepping barriers, widely open one-pole bridge without internal support was designed. The horizontal load carrying construction was solved by longitudinal pre-stressed bridge girders with yoked desk. The project proposed deep-drilled foundation.